DFW Airport’s growing demand for gates created the need for the design and construction of a bus station at Terminal D Gate 5.
The project consists of 3,000 SF two story building, connecting bridge to Terminal D building, exterior canopy.
The design includes two escalators, a stair and one elevator, as well as design for new gate, holding areas and seating.
SDS Architecture was the selected Architect of Record for the project. The design work was completed using the BIM technology.
The construction cost limitation for the project was $ 2,000,000.00.